Supplysum
Menu

How much concrete for a 24 × 30 slab?

A 24 × 30 ft slab (720 sq ft) poured 4 inches thick takes 8.89 cubic yards of concrete. With 10% extra for uneven ground and spillage, order 9.78 cubic yards of ready-mix or buy 440 bags of 80 lb mix.

Concrete for a 24 × 30 ft slab by thickness
ThicknessExact volumeOrder (+10%)80 lb bags60 lb bagsTypical use
4 in8.89 yd³9.78 yd³ (7.48 m³)440587Patio, walkway, shed floor
5 in11.11 yd³12.22 yd³ (9.34 m³)550734Hot tub pad, light driveway
6 in13.33 yd³14.67 yd³ (11.21 m³)660880Driveway, garage floor

Bag counts include the 10% extra and assume 0.60 ft³ per 80 lb bag and 0.45 ft³ per 60 lb bag.

Change the size, thickness or price

Concrete needed
9.78 yd³
80 lb bags
440
60 lb bags
587
40 lb bags
880

264 cubic feet = 9.78 cubic yards = 7.48 m³. Above about 1 cubic yard, ready-mix delivery is usually cheaper and faster than bags.

Rough material cost (cheapest option)

$1,662
Ready-mix: 9.78 × price per cubic yard
$
80 lb bags: 440 × price per bag
$

Ready-mix often has a short-load fee under 4–5 yd³. Rough 2026 US prices, edit to match local quotes.

FAQ

How many bags of concrete for a 24x30 slab?

At 4 inches thick, 440 bags of 80 lb concrete mix or 587 bags of 60 lb mix, including 10% extra. At 6 inches, 660 bags of 80 lb mix.

Should I use bags or ready-mix for a 24x30 slab?

Ready-mix is usually cheaper and much less work above about 1 cubic yard, and this slab needs 9.78. Under 4–5 yards many suppliers add a short-load fee, so compare a quote with 440 bags.

How do you calculate concrete for a 24 by 30 slab?

Multiply length × width × thickness in feet: 24 × 30 × (4 ÷ 12) = 240 cubic feet. Divide by 27 to get 8.89 cubic yards, then add 5–10% extra.

Other slab sizes